Evaluating the Effectiveness
of
Maryland’s Best Management Practices
for
Forest Harvest Operations
![]()
- Introduction
- Goals and Objectives
- Approach
- Best Management Practices Used In Study
- Data Collection and Analysis
- Results and Discussion
- Conclusions
- Literature Cited
- Appendix
Executive Summary Two small forested watersheds located on Sugarloaf Mountain in Frederick County, Maryland were monitored from August 1995 until July 1999 as part of a paired watershed study to evaluate the effectiveness of Maryland’s Best Management Practices (BMPs) for timber harvest operations. The study was designed to test the hypothesis that forest harvest operations have no long-term significant impacts on stream benthos, temperature, and suspended sediment if forestry BMPs are implemented. One watershed was designated as the “treatment” watershed, which was partially harvested after a one year calibration period. The second watershed was designated as a control, with no harvesting or other manmade disturbance taking place. Monitoring stations were established on the lower reaches of both watersheds, with biweekly baseflow and storm event water quality samples collected at each station and analyzed for total suspended solids. Automated recording temperature meters were installed in both watersheds. Benthic macroinvertebrate samples were taken in both watersheds each spring and fall. Photographic stations were also set up to document impacts of storm events on BMPs. Calibration period data exhibited a strong linear relationship between watersheds for both storm event suspended sediment concentrations and temperature. Following the calibration period roads, trails, landings, and stream crossings were installed or improved according to Maryland’s BMPs. Timber was harvested in 1997 on seven sections of the treatment watershed, totaling 73 acres, using a variety of silvicultural prescriptions. Following harvest, disturbed areas were stabilized where required by Maryland BMPs. Monitoring of baseflow and stormflow suspended sediment samples, temperature, and benthic macroinvertebrates continued throughout the harvest and post-harvest period. Weather during the four year term of this study varied from extremely dry to extremely wet. Analysis of total suspended solids indicated no significant change between the calibration period and the treatment period. Stream temperature and benthic macroinvertebrate populations also did not indicate a significant change as a result of the harvesting. Installation costs are highly dependent upon local weather and site conditions. Logger awareness and training is critical to effective use of BMPs, since implementation and installation are ultimately under their control.
This study was funded through a Clean Water Act Section 319(h) Grant from the U.S. Environmental Protection Agency.
Maryland Department of Natural Resources The Maryland Department of Natural Resources Forest Service wants to know if this service is helpful
Forest Service and Chesapeake & Coastal Watershed Service
Annapolis, Maryland / April 2000 / FWHS-FS-00-01
for you or your company, please send comments and/or suggestions to Maryland DNR.
Forestry Links
Forestry Home
Glossary
Forestry Acronyms
Email DNROther DNR info
DNR home page
Fisheries
Bays & Streams
Wildlife & Heritage